csp dividersvg
csp solution svg icon
Program

Foshan Association
Guangdong Energy & Water Efficiency

This program reduces process energy demand and energy losses by assessing the energy and water efficiency of textile printing and dyeing factories. The program involves setting benchmarks for energy and water consumption, identifying improvement potential, and mandating implementation plans. By selecting suitable products and guiding participating enterprises, this method enhances energy and water efficiency, contributing to energy, water and carbon reduction goals.

guangdong energy hero 1
swirls graphic blue

Solution tier focus

Guangdong Energy & Water Efficiency focuses on Tier 2.
Contact us about next steps
tree icon
Tier 4
Raw material extraction
arrow svg dark
yarn icon
Tier 3
Raw material processing
arrow svg dark
material icon
Tier 2
Material production
arrow icon light
sewing machine icon
Tier 1
Finished product assembly

Solution maturity level

Pre-seed

Definition:
Solutions that are at a concept level and in the process of evaluating and establishing their impact potential.

Pilot

Definition:
Solutions that are in the process of testing their solution in order to demonstrate a proof of concept.

Model

Definition:
Solutions that are working towards de-risking and reducing known barriers to scale.

Scale

Definition:
Solutions that are commercially viable with a proven go-to-market strategy.
Goal:
Implement program to improve device and operating efficiency in facilities.
Scale
tick icon
Current Level
Pre-seed
tick iconarroworange
Pilot
tick iconarroworange
Model
tick iconarroworange
Scale DEFINITION
Solutions that are commercially viable with a proven go-to-market strategy.
swirls graphic blueLEARN MORE ABOUT OUR MATURITY LEVELS
Current Level
Goal Of This Scale Solution
Implement program to improve device and operating efficiency in facilities.
swirls graphic blue
Pre-seed DEFINITION
Solutions that are at a concept level and in the process of evaluating and establishing their impact potential.
LEARN MORE ABOUT OUR MATURITY LEVELS
swirls graphic blue
Pilot DEFINITION
Solutions that are in the process of testing their solution in order to demonstrate a proof of concept.
LEARN MORE ABOUT OUR MATURITY LEVELS
swirls graphic blue
Model DEFINITION
Solutions that are working towards de-risking and reducing known barriers to scale.
LEARN MORE ABOUT OUR MATURITY LEVELS

Location Availability

Listed below are regions which this solution program can be rolled out to.
1
Available regions
65
Sites
swirls graphic blue

Actual Solution impact

Impact is calculated over the duration of the solution.
What are the different saving types?
Cloud icon
GHG savings
facility factory icon
0.05–0.55
kgCO2e
Average actual savings per kg of production
5-15% Average
Energy savings
facility factory icon
0.637–7.092
MJ
Average actual savings per kg of production
5-15% Average

Financial breakdown

1. The cost of expert on-site visit, data analysis, solution development and report;

2. The retrofit investment on devices and process upgrade;

3. The cost of engineer construction & installation of equipment.
Site Investment
dollarsign
Implementation Cost
calendar icon
18–24
Payback period
Average payback in months
tooltip icon
The average length of time required for an investment by a site to recover it's initial outlay in terms of profits or savings.
money cloud icon 1
1
tCO₂e =
$48
$67 industry average
Payback period
Average actual total investment cost per tCO₂e reduction
tooltip icon
The cost per tonne of CO₂e reduced as a result of the solution(s) over the useful life of each project, including brand and site program contributions, as well as all implementation costs.

Invested COST PER tCO2e

DISCLAIMER: These are average projected values, average cost and impact ratios will depend on site specific implementation.
What are the different saving types?
wavy divider transparent
swirls graphic blue

Implementation Plan

The program evaluates the efficiency of the key process of the factory; compares it with the target level; finds the difference; analyzes the standard and makes modification suggestions; and, finally, promotes the factory to implement transformation. Experts evaluate the transformation results.
calendar icon
12 months
Projected project length
cspflag
Implementation milestones
Projected project length
arrow right 1
1
Evaluate
arrow right 1
2
Benchmark
arrow right 1
3
Align facility to benchmark
arrow right 1
4
Analyze & make suggestions
arrow right 1
5
Implement suggestions
arrow right 1
6
Evaluate the results
wavy divider transparent
background2
foshan logo

Foshan Chuancheng Case Study

regions icon
1 Region
facility factory icon
1 Site
calendar icon
1 Year

Impact

Cloud icon
GHG saved
18,168,126
tCO2e
Energy saved
11,833,600
GJ

The Challenge

The program helped Foshan Chuancheng company upgrade two non-inverter oil-gas hybrid thermal oil heaters to full automation: one to an automatic inverter oil-gas hybrid thermal oil heater, and the other to an automatic inverter gas thermal oil heater. This enhanced automation and reduced energy consumption through inverter adjustments, improving energy efficiency
Read more case studies

Solution program growth

Since 2021, Guangdong Energy & Water Efficiency has been deployed in 65 sites.

65

Total Sites

2021-2023

Solution providers

Foshan Cleaner Production and Low-carbon Economy Association

Foshan Cleaner Production and Low-carbon Economy Association is a municipal non-profit social organization established in 2014, engaged in green cleaner production; energy, water, & carbon saving; environmental protection; comprehensive utilization of resources; training; research; and technical consulting services.

swirls graphic dark
swirls graphic blue

Interested in this solution?

Get in touch to learn more about how to implement this solution
Contact us about next steps